|
The track crew, Ray Cannon and Ed Amrhein, is shown cleaning and adjusting a girder rail switch at 28th street. The long item at the top of the picture is the movable point of the switch. The rail in the lower portion of the picture holds the movable point, which is help in by the two piece wedge lying across the rail. The large box to the bottom of the rail allows access to the wedge in its normal position.
|